Day 2 of the build with the contractors from BudgetHomeKits
Phase 3 of the build was getting the galvanized steel foundation forms set.
The first step for them was to set the height of the galvanized steel forms. They used a transient level to ensure it would be level. The instructions in the book were very detailed on this step but I was glad I didn't have to perform it. The galvanized forms are attached to the anchors there were installed in Phase 2. At this stage you could set your plumbing in the ground and have the concrete poured. Talking with the contractors they said it could be done at any stage prior to putting up the walls in phase 6.
They finished out Phase 4 as well with the installation of of the wall column posts onto the anchors. This appears to be a fairly easy step and once again the instructions were very detailed on how to complete this task.
This day was finished out by them starting Phase 5 of the plans - Framing the roof. They did the assembly of the roof trusses. They had to find a 4 wheel drive skylift for the next day getting the trusses installed on the posts.
Me and my family spent a lot of that day getting the wood under the carport and stacked for winter. The wood burning stove in the log cabin goes through a LOT of wood.