Hanging drywall and the instalation of the Heating and AC unit

 The drywall contractor said he would take 10 days to complete the house down to finish on the walls ready for paint. At the same time the heating and AC unit was installed in the attic and all of the ducts routed to each room. We didn't do any drywall in the ceiling except the closets. 

 



The tankless water heater and the water filter system for the well water in the false wall.


The master bath shower with bracing while the construction glue dries. This was another area that I made a mistake. I didn't know what shower unit I would get until after the house walls were all up. I knew it would be a right hand drain full size shower, what I didn't know is that the one I bought had shelves indented into the wall. That was a problem because it should have had the studs on each side of the shelves. I had to cut out the stud and foam behind the shower and then attempt to get more foam behind it to stiffen it up and insulate it. I get it done but made a hell of a mess of the shower with foam and we still have it all over the bottom. 


The nest of wires in the electrical panel. Nothing his hooked up yet as there is no service feed to the house yet. 










Comments

Popular posts from this blog

It is finally here!

Putting the roof on the porches

Background on our journey