More of the interior walls going up and starting the plumbing

 At this stage we were finishing up the interior wall layout and starting the running of plumbing and installing the tubs and showers. Overall this stage was pretty easy, just following the plans for each wall as indicated. I used a 22LR blank hammer shot to hold the bottom plates to the flooring. The first ones I tried were too strong and drove the nail straight into the concrete. I had to back off to the weakest load to the nails would not shoot through the bottom plate since they are aluminum and it doesn't take much to put the nail through it. 
















This is the false wall, the plywood is where the tankless water heater and the filtration system will go.