Putting in the doors and windows

This was a continuation of Phase 6. We did the installation of  the 2x4 frames for the windows and doors and getting them set. This process was  pretty straight forward but we had a few issues, I think the doors I bought were for a 2x6 frame not a 2x4, this didn't really show up - at least to me - until we were ready for drywall. The directions were very easy to understand on this stage. 

I didn't get any pictures but we also installed the wall band. Somehow I missed the part of the instructions where it said to install that BEFORE the doors and windows. But we got it installed. It is installed 4 feet 6 inches up on each stud. This will be used to secure the wall siding. Make sure to install the screws on the top and bottom of the band so the middle can be used for the siding.