Starting the ceiling and power is finally at the house

We finally got the service feed ran into the box and started working on the wiring of all the outlets and switches. The house is starting too look like a mess with the tongue and groove ceiling wood everywhere. We had to move the kitchen cabinets into the  house before they got ruined, they were stored in the carport by the log cabin. There were a few moisture issues on a couple of cabinets. 

There are piles and piles of these planks. 




The power panel all done except the lines for the heat and AC, the technician will do those.


The hot water heat all hooked up. That was scary with three 240 volt 40 AMP circuits.

We have lights!


The first ceiling in, the utility room, it was done with no stain. Just natural pine. The bathrooms will be the same.